Total Project Capex
₹19.8 Cr
Hard + Soft + Contingency
Capex per sqft
₹3,950 /sqft built-up
vs benchmark target
Capex per Seat
₹4.6 L/seat
incl. furniture & IT
Variance vs Target
−1.3 %
target ₹4,000/sqft
Top-Down Quick Estimate
| Driver | Value | Output |
|---|---|---|
| Fit-Out Grade Anchor | Standard Corporate | ₹3,800/sqft |
| City Multiplier | Mumbai · MMR | ×1.10 |
| Building Grade | Grade A | ×1.00 |
| Cat A Status | Standard Cat A | ×1.00 |
| Sustainability Uplift (IGBC + WELL + NZ) | IGBC Gold | +5.0% |
| Schedule Premium | Standard | +0.0% |
| Adjusted Hard Rate (₹/sqft built-up) | — | ₹4,390 |
| Built-up Area | 50,000 sqft | 50,000 |
| Top-Down Hard Cost | — | ₹21.95 Cr |
i
Top-down sits at ₹4,390/sqft against the JLL Standard Corporate band of ₹2,800–4,500. Within range.
Bottom-Up Line-Item Breakdown
| # | Cost Head | Specification | Rate ₹/sqft | Coverage % | Subtotal (₹ L) | Δ vs Bench |
|---|---|---|---|---|---|---|
| Hard Cost Subtotal (carpet area) | ₹— | — | ||||
| Bottom-Up Hard Cost (built-up area, ₹/sqft) | ₹— | — | ||||
Hybrid Reconciliation · Top-Down ↔ Bottom-Up
Top-Down Anchor
₹—
/sqftBottom-Up Result
₹—
/sqftReconciled (weighted)
₹—
/sqft—
Hard vs Soft Cost Split
Hard Construction Cost₹— (—%)
Design & Consultancy Fees₹— (—%)
Project Management Fees₹— (—%)
Permits + Insurance₹— (—%)
Contingency₹— (—%)
Move & Relocation₹— (—%)
Construction Cash-Flow S-Curve
Cumulative Spend
Monthly Run-Rate
Milestone
Peak month: —
Mobilisation: —
Retention release: —
Sensitivity Analysis · Top Drivers
Each bar shows the ₹ Cr change in total project cost if that single driver moves by ±1 standard deviation while all others stay constant. Longer bars = higher leverage. Use this to prioritise where to negotiate hardest.
Market Benchmark Comparison
| Source | Grade Match | Low | Mid | High | Your Estimate | Position |
|---|
Optimisation Suggestions
Final Estimate & Handoff
Project—
Built-up · Carpet—
Workstations · Density—
Estimating Stage · Confidence—
Hard Cost (Reconciled)—
Soft Costs (Design + PM + Permits + Insurance)—
Contingency—
Move & Relocation—
Total Project Capex—
Capex per sqft (built-up)—
Capex per Seat—
Variance vs Target—
Confidence Range (AACE)—